Therefore the diagram closes. The construction of the force diagram at grid line B is the
same.
Construction of the collector force diagram at grid line 2 (see Fig. 6.10): The direction of the
diaphragm shears transferred into the strut is shown in the figure.
Starting at grid line A:
7400
10
336 4
3
v SW
=
=+
.
plfunitshear in SW
andSW4
34
,
SW
+
12
v net
=+
336 4525 40
.
-
.
-
=+
243 86
.
plfnet shearatsh
earwalls
3575 lb compression at startof SW4
F =-
(.
52 54038
+
)(
)
= -
F i g u r e 6.10 Collector force diagram at grid line 2.