Civil Engineering Reference
In-Depth Information
tABle 3.4 Initial Pipe Conditions Information Created by Hammer-Version 07.00.049.00
(Snapshot for selected end points at time 4.9885 s) compared to equation of Regression software
“SPSS”.
FROM
HEAD
TO
HEAD
FLOW
VEL
NODE
(m)
NODE
(m)
(cms)
(m/s)
J6
133.4
J7
133.0
2.500
2.21
J7
133.0
J8
131.2
2.500
2.21
J3
135.0
J4
135.0
3.000
2.65
J4
135.0
J26
135.0
3.000
2.65
J26
135.0
J27
133.5
2.500
2.21
J27
133.5
J6
133.4
2.500
2.21
J8
131.2
J9
131.1
2.500
2.21
J9
131.1
J10
129.2
2.500
2.21
J10
129.2
J11
128.0
2.500
2.21
J11
128.0
J12
126.0
2.500
2.21
J12
126.0
J13
124.1
2.500
2.21
J13
124.1
J14
123.8
2.500
2.21
J14
123.9
J15
120.4
2.500
2.21
J15
120.4
J16
120.2
2.500
2.21
J16
120.2
J17
118.9
2.500
2.21
J17
118.9
J18
118.8
2.500
2.21
J18
118.8
J19
118.7
2.500
2.21
J19
118.7
J20
118.6
2.500
2.21
J20
118.6
J21
115.7
2.500
2.21
J21
115.7
J22
114.3
2.500
2.21
J22
114.3
J23
113.4
2.500
2.21
J23
113.5
J24
113.3
2.500
2.21
J24
113.3
J28
112.8
2.500
2.21
J28
112.8
N1
112.6
2.500
2.21
J1
40.6
J2
40.6
3.000
2.65
J2
40.6
J3
40.6
3.000
2.65
tABle 3.5 Valves (at node J26-J9-J15-J17-J20-J28) data table Created by Hammer-Version
07.00.049.00 compared to equation of Regression software “SPSS”.
** Air valve at node J26 **
Time
Volume
Head
Mass
Air-Flow
(s)
(m3)
(m)
(kg)
(cms)
0.0000
.000
134.99
.0000
.000
4.9885
.000
134.95
.0000
.000
 
Search WWH ::




Custom Search