Environmental Engineering Reference
In-Depth Information
Figure 4.23 Selection of 20 layouts of generated networks for set of 77 junctions
Three examples of non-randomly generated networks of 20 junctions in different categories
of complexity, have been shown in Figures 4.25 to 4.27. Finally, the results of EPANET
hydraulic simulations of the two generated layouts: (1) of 77 junctions and 100 pipes, and (2)
of 200 junctions and 271 pipe, both in non-optimised and optimised version, have been
shown in Figures 4.28 to 4.30, respectively.
 
Search WWH ::




Custom Search