Environmental Engineering Reference
In-Depth Information
Powered.Industrial.Trucks.(Forklifts)—1926.602(d)
Site.Clearing—1926.604(a)(1)
s
ubPArt
P — E
xCAvAtions
General.Protection—1926.651(c)(1)(i)
s
ubPArt
q — C
onCrEtE
AnD
m
Asonry
C
onstruCtion
Concrete.and.Masonry.Construction—1926.701(a)
s
ubPArt
r — s
tEEl
E
rECtion
Bolting,.Riveting,.Fitting-Up,.and.Plumbing-Up—1926.752(d)(4)
s
ubPArt
s — u
nDErgrounD
C
onstruCtion
, C
Aissons
,
C
offErDAms
,
AnD
C
omPrEssED
A
ir
Underground.Construction—1926.800(d)
Compressed.Air.—1926.803(a)(1).&.(2)
s
ubPArt
t — D
Emolition
Preparatory.Operations—1926.850(a)
Chutes—1926.852(c)
Mechanical.Demolition—1926.859(g)
s
ubPArt
u — b
lAsting
AnD
u
sE
of
E
xPlosivEs
General.Provisions—1926.900(a)
Blaster.Qualiications—1926.901(c),.(d),.&.(e)
Surface.Transportation.of.Explosives—1926.902(b).&.(i)
Firing.the.Blast—1926.909(a)
s
ubPArt
v — P
owEr
t
rAnsmission
AnD
D
istribution
General.Requirements—1926.950(d)(1)(ii)(a),.(c),.(vi).&.(vii)
Overhead.Lines—1926.955(b)(3)(i)
Underground.Lines—1926.956(b)(1)
Construction.in.Energized.Substations—1926.957(a)(1)
s
ubPArt
x — s
tAirwAys
AnD
l
ADDErs
Ladders—1926.1053(b)(15)
Training.Requirements—1926.1060(a)(i)-(v).&.(b)