Figure 16.5.6 Building heated and air-conditioned by the tri-generation plant in Italy (Badami and
Portoraro, 2009).
B
Building
conditioned
supply air
return air
O
to chimney
Hum
Hum
N
R
Exhaust gases
gas/water
heat exchanger
Rotary Heat
Exchanger
exhaust
air
S
exhaust air
M
electrical power
water/water
heat exchanger
NG Congenerator
cold water
to user
Natural gas
Desiccant
regenerator
Desiccant
conditioner
moist air
cooling
tower
L
outdoor air
outdoor air
20.000 m3/h
outdoor air
20.000 m3/h
Figure 16.5.7 Layout of the tri-generation plant in Italy (Badami and Portoraro, 2009).
heat exchangers and the connecting pipes. Based on the economic analysis, the system
payback time was assessed as 6.8-7.7 years. The system is an interesting alternative to
common AC technologies and further investigation and analysis will be done on the
system's actual operation.