27 Receipt of property from another federal agency when there is no
anticipated or proposed substantial change in land use
34 New construction that is similar to existing land use and, when
completed, the use or operation of which complies with existing
regulatory requirements (e.g., a building within a cantonment area with
associated discharges/runoff within existing handling capacities)
28 Minor land acquisitions or disposals where anticipated or proposed
land use is similar to existing land use and zoning, both in type
and intensity
35 Demolition, disposal, or improvements involving buildings or
structures when done in accordance with applicable regulations
including those regulations applying to removal of asbestos, PCBs, and
other hazardous materials
29 Disposal of excess easement interests to the underlying fee owner
30 Renewals and minor amendments to existing real estate grants for use
of government-owned real property where no signiicant change in
land use is indicated
36 Acquisition, installation, and operation of utility (e.g., water, sewer,
electrical) and communication systems (e.g., data processing cable and
similar electronic equipment) that use existing rights-of-way, easements,
distribution systems, and/or facilities
31 Land withdrawal continuances or extensions that merely establish
time periods and where there is no signiicant change in land use
37 Decisions to close facilities, decommission equipment, and/or
temporarily discontinue use of facilities or equipment, where the facility
or equipment is not used to prevent/control environmental impacts
32 Renewals and/or initial real estate in grants and out grants involving
existing facilities and land wherein use does not change signiicantly
(e.g., leasing of federally owned or privately owned housing or ofice
space, and agricultural out leases)
38 Maintenance dredging and debris disposal where no new depths are
required, applicable permits are secured, and disposal will be at an
approved disposal site
33 Grants of license, easement, or similar arrangements for the
use of existing rights-of-way or incidental easements complementing
the use of existing rights-of-way for use by vehicles (not to
include signiicant increases in vehicle loading) electrical,
telephone, and other transmission and communication lines;
water, wastewater, storm water, and irrigation pipelines,
pumping stations, and facilities; and for similar utility and
transportation uses
39 Relocation of personnel into existing federally owned or commercially
leased space that does not involve a substantial change affecting the
supporting infrastructure (e.g., no increase in vehicular trafic beyond
the capacity of the supporting road network to accommodate such an
increase)