CC.S2.6
Co-Ordination with Existing Protection
CC.S2.6.1
A
Generator
must meet, in relation to a
WFPS
, the target
clearance times for fault current interchange with the
Transmis-
sion System
in order to reduce to a minimum the impact on the
Transmission System
of faults on circuits owned by
Generators
.
The target clearance times are measured from fault current
inception to arc extinction and will be specified by the
TSO
to
meet the requirements of the relevant part of the
WFPS
pursuant
to
CC
.S2.1. Unless otherwise agreed, the fault clearance times
specified in the
Connection Agreement
or other agreement shall
not be greater than:-
(i)
80 ms at 400 kV;
(ii)
100 ms at 275 kV;
(iii)
100 ms at 132 kV; and
(iv)
100 ms at 33 kV
The
TSO
shall ensure that (subject to any necessary dis-
crimination) the same target fault clearance times can be achieved
by its own
Plant
and
Apparatus
at each
Connection Point
. For
the avoidance of doubt, the
Protection
here specified is to
achieve fault clearance for faults within (or in the immediate
vicinity of the
Wind Farm Station
which have not been cleared
by other protection due to a failure of that protection) and such
Protection
shall remain insensitive to faults external to the
Wind
Farm Power Station
in circumstances where the fault contribu-
tion of the
Wind Farm Power Station
is within the time based
rating of the
Wind Farm Power Station Equipment
. No form of
action taken by control or
Protection Equipment
within the
Wind Farm Power Station
shall act so as to prevent the
Wind
Farm Power Station
achieving the Fault Ride Through require-
ment stipulated in
CC
.S2.3.6
CC.S2.6.2
Unless otherwise agreed in the
Connection Agreement
or other
agreement, nothing in this
CC
.S2.6.2 shall prevent a
WFPS
or the
utility
Plant
and
Apparatus
at the
Connection Point
from hav-
ing faster clearance times than those specified in the
Connection
Agreement
or other agreement (subject to necessary discrimina-
tion being maintained). The times specified in the
Connection
Agreement
or other agreement will reflect the
TSO's
view of the
requirements of both the
Transmission System
and the
User's
System
for the expected life time of the
Protection
(e.g.
15 years). The probability that the fault clearance times stated