Environmental Engineering Reference
In-Depth Information
Te rrace cut into slope
Slope terracing
New uniform slope surface
Excavated and filled area
Original surface
Fill
Excavation limits/fill subgrade
Original surface
Cut area
New uniform slope surface
Cut
Slope shaping by cutting and/or filling
Key
Filled area
Notch
Slope keying for fill placement
Filled area
Counterweighting toe
of slope
FIGURE 8.26 Bank-grading. (From NRCS, Streambank and shoreline protection. Chapter 16 in Engineering
Field Handbook , Natural Resources Conservation Service, p. 55, 1996a.)