Doug has an issue. He has received the preliminary building model
from the architect but has not been able to set up each space to get an
accurate building load takeoff prior to the next project design meeting.
Knowing that Revit MEP automatically defaults to a global building
type, he adjusts the building type to Office, adjusts the required
parameter values, and tells the program to lay out the spaces
automatically.
Doug is able to quickly generate initial heating, cooling, and ventilation
loads, and with that data, the mechanical design team will be able to
analyze different system possibilities to condition the building and
present options to the project team.