FIGURE 4.15
Sequential Activities in Surface Hard
Rock Mining
MINE WASTE MANAGEMENT
MINING AND ORE PROCESSING
Land Clearing Including
Removal of Topsoil and Subsoil
Each mining activity considered alone
is rather simple, but to optimize the
many contemporaneous activities
requires sophisticated planning and
scheduling.
Topsoil Stockpiling
(if necessary)
Waste Rock Drilling
and Blasting
Waste Rock Placement (in-pit,
ex-pit, trans-pit), Contouring
and Compacting
Waste Rock Removal
Topsoil Placement
Ore Drilling and Blasting
Ore Loading and
Transporting
Revegetation
Milling
Tailings Placement
Ore Dressing/Beneficiation
Thickening
Rehabilitation
Concentrate Transportation
Concentrate Drying/
Port Stockpile
Stacker/Reclaimer
Ship Loading/Conveyor
Land Clearing
Land clearing is the i rst step in the physical preparation of the mine site. It leads to
the i rst signii cant visual impact, removes wildlife habitat, and predisposes the sur-
face to accelerated erosion by wind and water (discussed in detail in Chapter Twenty).
 
 