Responsibility Data Source
Client Consultant Exist To be
generated
3.3 Project time line
●
Exploration phase
●
Bankable feasibility phase
●
EIA approval
●
Construction phase
●
Expected mine life
●
Mine closure
●
Post-mining environmental care period
3.4 Ore reserves/resources in terms of
●
Cutoff grade
●
Proven reserves (spatial distribution, depth, volume)
●
Grade and ore composition (associated metals)
3.5 Mining schedule, including
●
Average ore production
●
Maximum mine production
3.6 Mining methods including simplii ed l ow chart covering
mining up to product shipping
3.7 Details of processing facilities, such as
●
Type and size of mill
●
Type of benei ciation (hydro-, pyro-metallurgical process details)
●
Chemicals/input materials used
●
Energy demand
●
Gaseous emissions (gases, noise, and particulates)
●
Hydrocarbon wastes
●
Toxic and hazardous wastes
3.8 Details of supporting infrastructure including
●
Roads and bridges
●
Haul road
●
Rail lines and bridges
●
Conveyor belts
●
Harbour facilities (wharves/jetties, breakwaters, anchorages, aids
to navigation)
●
Airi eld/heliport
●
Conveyor
●
Housing/Community complexes
●
Health facility
●
Ware house, maintenance yard
●
Energy (source, generation and distribution)
●
Waste water treatment facility
●
Fuel pipelines
●
Quarries, borrow pits
●
Dams, dikes, levees, causeways, canals
●
Sanitary land i ll
●
Medical waste incinerator