human resource deployment in mine construction. Note that it is important to be receptive to
completely different solutions than those presented in the mine proposal. It is also important
that alternatives be real, so they can provide a basis for meaningful comparison. The cred-
ibility of an assessment of project alternatives and, ultimately, of the environmental impact
assessment is at risk if the mine proposal is identii ed as the preferred solution and is put into a
favourable light by comparing it to poor or 'straw man' alternative solutions ( Case 2.4 ).
The assessment of project alternatives is not always mandatory, but it should always be
part of an EIA as good practice. International lenders such as the World Bank often require
a systematic comparison of the proposed investment design, site, technology, and opera-
tional alternatives (World Bank OD 4.01, Annex B 1989; IFC 2006). Alternatives are to be
considered in terms of their potential environmental impacts, capital and recurrent costs,
FIGURE 2.7
Specifying Individual Emissions -
Source, Quantity, Quality and
Emission Point
A set of information helps illustrate
mine outputs a tabular listing of related
group of emissions, together with an
illustration showing where emissions
are generated (using the operational
fl owchart) and discharged to the
environment (using the location map).
LISTING OF EMISSION SOURCES
Emission Source
Estimated Quantity
Estimated Quality
Emission Point
List emission sources e.g.
Main stack
Uncondensated gas
Coal fired power plant
Specify total annual
emission per source
(e.g. tons per annum)
List emission concentration
or refer to table detailing flue
gas composition including
relevant emission standards
(see table below)
Specify discharge point
(e.g. main stack) and refer to
figure 'Location Map' and/or
'Process Flow Diagram'
(see graphic below)
ESTIMATED EMISSION CONCENTRATIONS (e.g. Main Stack)
Estimated
Concentration
Host Country
Standards
Other Guidelines Used
in the Assessment
Parameter
Unit
IFC Guidelines
List of relevant Parameters, e.g
Sulphur dioxide
g/m 3
LOCATION MAP
PROCESS FLOW DIAGRAM
Main Stack
Bauxite Ore
Bauxite Ore
Power Plant
Steam and
Power Generation
Grinding
Unconden-
sated Gas
Digestion
Steam Energy
Digestion
Stack
Bauxite
Delivery
Uncondensed Gas
Precipitation
Main
Stack
Filtration
Alumina
Load Out
Clarification
Calcination
Residue
Disposal
Stack
Calcination
Precipitation
 
 