Table 18. Continued
H/W flow
m 3 /h
Production
m 3 /month
TME110
hrs
Month
Startups
13.5
3280
0
1
12
3190
0
1
Dec.
21
2150
0
28
19.5
2170
0
27
18
2370
0
18
16.5
2600
0
7
15
2650
0
4
13.5
2580
0
4
12
2420
0
12
Total
21
41700
2020
111
19.5
42800
1532
61
18
43200
989
37
16.5
43400
677
16
15
43000
421
10
13.5
42600
223
13
12
41900
74
23
Table 19. Optimum operating conditions for the Abu Dhabi solar desalination plant
Bypass
valve
Open
( o C)
Bypass
valve
Close
( o C)
Absorber
area
(m 2 )
H/C
flow
(m 3 /h)
H/W
flow
(m 3 /h)
F/W
flow
(m 3 /h)
Evaporator
Start ( o C)
Evaporator
Stop ( o C)
Month
Jan.
1862
83.6
63
67
16.5
17.5
67
62
Feb.
1862
83.6
65
69
13.5
17.5
70
64
Mar.
1862
83.6
68
72
12.0
17.5
73
67
Apr.
1764
79.2
69
69
13.5
17.5
73
68
May.
1862
83.6
70
74
16.5
17.5
73
69
Jun.
1862
83.6
71
75
16.5
17.5
75
70
Jul.
1862
83.6
70
74
19.5
17.5
74
69
Aug.
1862
83.6
72
76
18.0
17.5
76
71
Sep.
1862
83.6
74
78
13.5
17.5
78
73
Oct.
1862
83.6
69
73
16.5
17.5
73
68
Nov.
1862
83.6
67
71
16.5
17.5
71
66
Dec.
1862
83.6
65
69
15.0
17.5
69
64
10.2. Simulation Results
Simulated operation of the test plant under the optimum operating conditions noted above
was carried out using the solar radiation data of 1985. The results are shown in table 20. The
effective annual water production is 42,900 m 3 , the annual operating rate of the evaporator is
97.6% (number of evaporator starts and stops = 13), and the specific power consumption is
5.1 kWh/m 3 of product water.