Environmental Engineering Reference
In-Depth Information
Fig. 22.1
Temporal development of a contaminant plume in groundwater due to Natural
Attenuation processes. Plume expansion occurs during time steps 1 and 2, during time steps 3
and 4 the contaminant plume has reached steady-state conditions, while the plume shrinks in step
5 (adapted from Teutsch and Rügner (
1999
))
Fig. 22.2
Overview over contaminant input and output processes and their role with respect to
contaminant plume development. Active remediation measures contribute optionally to a con-
taminant output in groundwater, either by contaminant destruction (e.g., ENA) or by shifting
contaminants into other compartments (e.g., Pump and Treat) (adapted from Grandel and Dahmke
(
2008
))
Search WWH ::
Custom Search