Table 1. Safety assessment of modernization (implementation) of the NPP I&C systems at LC stages
LC stage of the NPP
I&C systems
Documents substantiating safety of the NPP I&C
systems at LC stages
Reports of expert review of the NPP I&C
systems
Development of
modification concept of
the NPP I&C systems (or
implementation of the
new NPP I&C systems)
Conceptual technical decision of modernization of the
NPP I&C systems
Report of state expert review of NRS of
conceptual technical decision of the NPP I&C
systems modernization
Development of technical
requirements on creation
(modernization) of the
NPP I&C systems
Requirements specification to (modernization) of the
NPP I&C systems
Report of state expert review of NRS of
requirements specification for creation
(modernization) of the NPP I&C systems
Design, production and
testing of I&C systems
components on the
enterprise
Technical project of the NPP I&C systems
Report of state expert review of NRS of technical
project of the NPP I&C systems
Programs and methods of preliminary testing of I&C
systems components
Safety assessment at this stage is not performed
Act and protocols of preliminary testing of I&C systems
components
Quality assurance program of modernization of the NPP
I&C systems
Safety assessment for these documents is
performed in frame of expert review of NRS
of technical decision of the NPP I&C systems
assembling
Software verification plan of the NPP I&C systems
Software verification report of the NPP I&C systems
Validation plan of the I&C systems for the NPP I&C
systems assembling
Report of design assessment of reliability of the NPP
I&C systems
Assembling and
commissioning of the
I&C systems at NPP
Technical decision of assembling performance of the
NPP I&C systems
Report of state expert review of NRS of technical
decision of the NPP I&C systems assembling
with a package of documents
Report of I&C systems validation for the NPP I&C
systems assembling
Report of failure response analysis of the NPP I&C
systems
Preliminary safety analysis report of the NPP I&C
systems
Program and methods of preliminary on-site testing of
the I&C systems
Putting the I&C systems
into trial operation at
NPP
Technical decision of inputting the modernized NPP
I&C systems into trial operation
Report of state expert review of NRS of technical
decision for putting of modernized NPP I&C
systems into trial operation with a package of
documents
Documents containing results of assembling and
commissioning
Results of on-site testing of the modernized I&C
systems
Information about personnel training involved in the
NPP I&C systems operation
Information about introduction of temporary changes in
design and operational documentation of the NPP I&C
systems
Program of trial operation of the NPP I&C systems
continued on following page