Environmental Engineering Reference
In-Depth Information
Figure 2. Structure and configuration of SHC E&PRP set
◦ From seismic sensors (earthquake
detection with intensity above the
limit);
Receiving of commands from the control
keys located in the main control room and
the emergency control room, that initiate:
◦ Accident and protection systems
actuation;
◦ Return to normal position after emer-
gency protection actuation;
◦ Display switch-of that indicates the
actuation reason.
Computation of parameter values which
cannot be measured directly, for example,
diferences of irst and second circuits
saturation temperatures (further - design
values);
Storing of data:
◦ On control parameters limits;
◦ On conditions of normal and safe
power unit performance;
◦ On signal forming algorithms, initi-
ating actuation emergency and pre-
ventive reactor protection in case of
violation of these conditions or ex-
ceeding the set limits;
Additional functions of signal forming cabi-
nets:
Continuous monitoring of technical state
condition of its hardware, adjacent equip-
ment and signal and message lines;
Forming and sending to workstation of
digital messages which contain informa-
tion on the current monitoring parameters
values, initial events, state of technological
equipment and diagnostics results;
Forming in accordance with the algorithm
and sending to cross output cabinet of
control signals (commands ERP or PRP1,
PRP2) in case of detection of any emergen-
cy or preventive reactor protection actua-
tion conditions (depending on conditions
caused system actuation, the control signal
delay and / or automatic signal withdrawal
after the set time delay are provided);
Setting and changing of the control param-
eters limits.
Structural scheme of signal forming cabinet
are shown at Figure 3.
Search WWH ::