Environmental Engineering Reference
In-Depth Information
97 See, e.g. , Vestel, Wind Turbine Projects Run Into Resistance (stating that
“many radar systems in use in the United States date back to the 1950s
and have outdated processing capabilities—in some cases, less than those
of a modern laptop computer”); Elizabeth Burleson, Wind Power, National
Security, and Sound Energy Policy , 17 Penn. St. Envtl. L. Rev. 137, 43 (2009)
(quoting the United States Department of Energy as stating that “[t]here are
a number of technical mitigation options available today, including software
upgrades to existing radar, processing filters related to signature identifi-
cation, [and] replacing aging radar”) (citations omitted); Robert Mendick,
Military Radar Deal Paves Way for More Wind Farms Across Britain , The
Telegraph (Aug. 27, 2011), available at www.telegraph.co.uk/earth/energy/
windpower/8726922/Military-radar-deal-paves-way-for-more-wind-farms-
across-Britain.html (last visited Dec. 12, 2011).
98 Robert Mendick, Military Radar Deal Paves Way for More Wind Farms Across
Britain , The Telegraph (Aug. 27, 2011), available at www.telegraph.co.uk/
earth/energy/windpower/8726922/Military-radar-deal-paves-way-for-more-
wind-farms-across-Britain.html (last visited June 22, 2012).
99 See, e.g. , Michael Brenner, Wind Farms and Radar 8-9 (2008), Federation of
American Scientists, www.fas.org/irp/agency/dod/jason/wind.pdf (last visited
March 1, 2011) (“The cost of a single radar installation was said to be in the
range of $3-8M, to be compared with the $2-4M cost of a single wind turbine,
and the roughly $0.5M annual electric production of a single turbine (5×106
kWh, at $0.10/kWh retail). A wind farm can have hundreds of turbines”).
100 John Acher, Next Thing in Wind Energy: Stealth Turbines , Reuters (June
29, 2011), available at www.reuters.com/article/2011/06/29/us-windenergy-
stealth-vestas-idUSTRE75S2JM20110629 (last visited June 22, 2012).
101 David Danelski, Mojave Desert: Military Wants to Limit Wind Development ,
The Press-Enterprise (May 20, 2012), available at www.pe.com/local-news/
topics/topics-environment-headlines/20120520-mojave-desert-military-wants-
to-limit-wind-development.ece (last visited June 22, 2012).
102 Mark Colette, Kingsville Officials Opposed Wind Farm Near Riviera: Navy Says
Impact Will Be Minimal , Corpus Christi Caller-Times (March 28, 2012),
available at www.caller.com/news/2012/mar/28/kingsville-oicials-oppose-
wind-farm-near-navy/ (last visited June 22, 2012).
103 Rebekah L. Sanders & Ryan Randazzo, Arizona's Solar Energy Plans Vex
Military , AZCentral.com (Apr. 7, 2012), available at www.azcentral.com/
news/articles/2012/03/23/20120323arizona-solar-energy-plans-military.html
(last visited June 22, 2012).
104 See Osage Nation v. Wind Capital Group, LLC , 2011 WL 6371384 (N.D.
Okla. 2011).
105 Id. at 11.
106 Ana Campoy & Stephanie Simon, Wind Fuels Fight in Oil Patch, Wall Street
Journal (Nov. 26, 2011).
107 K. K. DuVivier, Animal, Vegetable, Mineral—Wind? The Severed Wind Power
Rights Conundrum , 49 Washburn L.J. 69, 86 (2009).
108 See Kathleen D. Kapla & Craig Trummel, Severing Wind Rights Raises Legal
Issues, North American Wind Power (October 2010), available at http://
kaplalaw.com/NAW1010_WindRightsArticle.pdf
109 See N.D. Cent. Code 17-04-04 (2010); S.D. Codified Laws 43-13-19 (2010);
Wy. Stat. Ann. 34-27-103 (2011); Mont. Code Ann. § 70-14-404 (2011); Neb.
Rev. Stat. § 76-3004 (2010).
110 Marty Touchette, Wind Farm Opponents Cite Concerns for Crop Dusting ,
ReviewAtlas.com (Aug. 3, 2010), available at www.reviewatlas.com/news/
 
Search WWH ::




Custom Search