Environmental Engineering Reference
In-Depth Information
29
Id.
30
See
Malewitz,
supra
note 24.
31
See
id.
32
At least two other scholars have highlighted this “chicken-and-egg” problem in
the context of interregional transmission siting.
See, e.g
., Jennifer E. Gardner
& Ronald L. Lehr,
Wind Energy in the West: Transmission, Operations,
and Market Reforms
, 26 WTR Nat. Resources & Env't 13 (Winter 2012);
Glen Wright,
Facilitating Efficient Augmentation of Transmission Networks to
Connect Renewable Energy Generation: The Australian Experience
, 44 Energy
Policy 79, 80 (2012).
33
See
Allison Schumacher, et al.,
Moving Beyond Paralysis: How States and
Regions Are Creating Innovative Transmission Policies for Renewable Energy
Projects
, 22 Electricity J. 27 (2009).
34
See
id.
35
See
id.
36
See generally
Francisco J. Barnes,
An Open Season Scheme to Develop
Transmission Interconnection Investments for Large Wind Farms in Mexico
,
Comision Reguladora de Energia (2009), available at
http://siteresources.
1239633250635/Francisco_J_Barnes.pdf
(last visited Feb. 24, 2014).
37
See
Miriam Sowinski,
Practical, Legal, and Economic Barriers to Optimization
in Energy Transmission and Distribution
, 26 J. Land Use & Envtl. L. 503, 521
(2011) (describing a cost estimate of a project by American Electric Power).
38
Brown & Rossi,
supra
note 18 at 758.
39
See
Mills,
supra
note 14 at v.
40
See
Duncan & Sovacool,
supra
note 8 at 296.
41
See
Kallies,
supra
note 7 at 152.
42
See
Wright,
supra
note 32 at 80-81.
43
See
Norris & Dennis,
supra
note 16 at 6.
44
See
Gardner & Lehr,
supra
note 32 at 14 (Winter 2012) (citing Matthew H.
Brown & Richard P. Sedano,
Electricity Transmission: A Primer
22 (2004)).
45
For a description of the proposed “bridge to nowhere” and its ultimate demise,
see generally
Carl Hulse,
Two “Bridges to Nowhere” Tumble Down in Congress
,
New York Times at A19 (Nov. 17, 2005).
46
See
Kallies,
supra
note 7 at 153-54.
47
Transmission Planning and Cost Allocation by Transmission Owning and
Operating Public Utilities
, 136 FERC ¶ 61051 (2011).
48
Id.
49
Id. at 440.
50
Federal Energy Regulatory Commission,
Briefing on Order 1000
, Slide 14
(2011), available at
www.ferc.gov/media/news-releases/2011/2011-3/07-21-11-
E-6-presentation.pdf
(last visited Sept. 24, 2013).
51
See generally
Illinois Commerce Commission v. FERC
, 2013 WL 2451766
(2013).
52
Sonal Patel,
Challenges to Order 1000 Filed in Federal Court as President Acts
on Grid Modernization
, Power (June 13, 2013), available at
www.powermag.
on-grid-modernization/
(last visited Sept. 24, 2013).
53
Ros Davidson,
Grid Must Catch Up with Renewables Growth
, Windpower
Monthly (Sept. 1, 2013), available at
www.windpowermonthly.com/
article/1209701/grid-catch-renewables-growth
(last visited Sept. 24, 2013).
54
Id.
Search WWH ::
Custom Search