Environmental Engineering Reference
In-Depth Information
Figure 5 Low and high estimates of lifecycle carbon dioxide equivalent from various
fuel sources. 50
completion is done with special temporary equipment at the well site and
after a period of time (days) the gas and liquids being produced at the well
are directed to permanent separators and tanks. The gas is then transported
through piping and meters that are installed at the well site. Green
 
Search WWH ::




Custom Search