Information Technology Reference
In-Depth Information
Prahalad, C. (1997). A Organização Reestruturável . In
A Organização do Futuro: como preparar as empresas
de amanhã . São Paulo, Brasil: Futura.
Rai, A., Patnayakuni, R., & Seth, N. (2006, June). Firm
Performance Impacts of Digitally Enabled Supply Chain
Integration Capabilities. Management Information Sys-
tems Quarterly , 30 (2), 225-246.
Prahalad, C. K. (2008). The new age of innovation: Driv-
ing Co-Created Value Through Global Network . New
York: McGraw Hill.
Rainville-Pitt, S., & D'Amour, J. (2007). Using a CMS
to create fully accessible websites. In Proceedings of
the 2007 international Cross-Disciplinary Conference
on Web Accessibility (W4a) (Vol. 225).
Prahalad, C., & Hamel, G. (1998). A Competência Essen-
cial da Corporação . In Montgomery, C. A., & Porter, M.
E. (Eds.), Estratégia A Busca da Vantagem Competitiva .
Rio de Janeiro, Brasil: Elsevier Editora.
Rajendran, C. (1992). Two-stage flowshop scheduling
problem with bicriteria. The Journal of the Operational
Research Society , 43 (9), 879-884.
Premkumar, G., Ramamurthy, K., & Liu, H. (2008).
Internet messaging: An examination of the impact of
attitudinal, normative, and control belief systems. In-
formation & Management , 45 , 451-457. doi:10.1016/j.
im.2008.06.008
Rajendran, C. (1993). Heuristic algorithm for schedul-
ing in a flowshop to minimize total flowtime. Interna-
tional Journal of Production Economics , 29 , 65-73.
doi:10.1016/0925-5273(93)90024-F
Prisma . (2006). Retrieved July 2006, from http://www.
prisma.pt/1024/index.htm
Rajendran, C. (1995). Heuristics for scheduling in
flowshop with multiple objectives. European Journal of
Operational Research , 82 , 540-555. doi:10.1016/0377-
2217(93)E0212-G
Protégé. (2007). The Protégé Ontology Editor for
Knowledge Acquisition System . Retrieved from http://
protege.stanford.edu
Rajendran, C., & Ziegler, H. (1997). An efficient heu-
ristic for scheduling in a flowshop to minimize total
weighted flowtime of jobs. European Journal of Op-
erational Research , 103 , 129-138. doi:10.1016/S0377-
2217(96)00273-1
Prudhomme, G. (2000). Analyse Fonctionnelle et dé-
marche de conception . In Drăghici, G., & Brissaud, D.
(Eds.), Modélisation de la connaissance pour la concep-
tion et la fabrication intégrées (pp. 7-30). Timisoara,
Romania: Editura Mirton.
Rajendran, C., & Ziegler, H. (2004). Ant-colony algo-
rithms for permutation: flowshop scheduling. Euro-
pean Journal of Operational Research , 155 , 426-438.
doi:10.1016/S0377-2217(02)00908-6
Prusak, L. (2001). Where did knowledge management
come from? IBM Systems Journal , 40 (4), 1002-1007.
doi:10.1147/sj.404.01002
Rajendran, C., & Ziegler, H. (2005). Two ant-colony
algorithms for minimizing total flowtime in permuta-
tion flowshops. Computers & Industrial Engineering ,
48 , 789-797. doi:10.1016/j.cie.2004.12.009
PT-SI . (2006). Retrieved July 2006, from http://www.
ptsi.pt/PTSI/Canais/Solucoes/Outsourcing/
Quinn, F. (2003). The Elusive Goal of Integration. Supply
Chain Management Review , 7.
Rajendran, C., & Ziegler, H. (2009). A Multi-Objective
Ant- Colony Algorithm for Permutation Flowshop Sched-
uling to Minimize the Makespan and Total Flowtime
of Jobs . In Chakraborty, U. K. (Ed.), Computational
Intelligence in Flow Shop and Job Shop Scheduling
(pp. 53-99). Berlin: Springer-Verlag. doi:10.1007/978-
3-642-02836-6_3
Raden, N. (2004). Dashboarding ourselves. Intelligent
Enterprise , 7 (8).
Raghu, T. S., & Vinze, A. (2007). A business process
context for Knowledge Management. Decision Support
Systems , 43 , 1062-1079. doi:10.1016/j.dss.2005.05.031
Search WWH ::




Custom Search