Information Technology Reference
In-Depth Information
How to do it…
Proceed with the following steps to make a field required in JIRA:
1. Log into JIRA as a JIRA administrator.
2. Navigate to
Administration
|
Issues
|
Field Configurations
.
3. Click on the
Configure
link for the field configuration used by the project and is-
sue type.
4. Click on the
Required
link for
Priority
and
Due Date
as shown in the following
screenshot: