Environmental Engineering Reference
In-Depth Information
Table 13.1 (continue d)
Case area
Chile
Regime indicators
Operationalisation
Switzerland
Flexibility : Proportional
reduction or prioritisation of
water rights/uses.
No prioritisation of uses in 'normal' periods;
Tourno allows for proportional reduction of
water rights within the separate sections of
the basin; DGA prioritises domestic water,
then irrigation during decreed drought
periods; flexible reduction in rights distribu-
tion according to % of flow.
Priorities for set periods in canton legal frame-
work; domestic water is prioritised during
scarcity situations.
Integration
Environmental Protection :
Provisions for the protection
of aquatic ecosystems.
Water code differentiates between surface and
ground waters; drought declarations allow
provisional rights for surface- and groundwa-
ter and remove limits of ecological flows.
WPA provides for quality and quantity protection
of waterways and aquatic ecosystems;
environmental protection responsibility of
Canton.
Systemic Integration :
Sustainability of the SES is
taken as a goal not just
tacked on.
Environmental protection framework is weak,
with little monitoring and enforcement and
weak EIA process; environmental flows
unaccounted for in existing rights, only new
rights; DGA's (responsible for surface and
groundwater sustainability) technical criteria
of sustainability have no legal basis, but are
internal guidelines. MMA separately sets and
monitors water quality ( Norma secondarias
de cualidad de agua ).
Environmental flows to be accounted for in new
hydropower concession period (but challenges
in enforcement); social and ecological
sustainability, and 'room for waterways'
integrated into Cantonal Water Law (2008).
Accountability
Neutrality : Appropriate checks
and balances; fairness across
economically diverse actors.
Economic priority across ministries gear water
management for exploitation; register of
trades and rights happens with the
Conservador , which is private but they have a
monopoly for each region, and is under the
control of the judiciary (with accusations of
nepotism).
Provisions concerning project and planning
proposals and EIA provide for multi-stake-
holder input (VBR); environmental depart-
ment responsible for evaluating EIAs from
energy and other departments..
 
Search WWH ::




Custom Search