Environmental Engineering Reference
In-Depth Information
Klass, A. B. and E. J. Wilson. (2012) Interstate Transmission Challenges for Renewable
Energy: A Federalism Mismatch.
Vanderbilt
Law
Review
, 65 (1801-1873).
Lacey, S. (2013)
This is What the Utility Death Spiral Looks Like
. San Francisco, CA:
Green Tech Media.
http://www.greentechmedia.com/articles/read/
Lang, M. and U. Mutschler. (2013)
Bundesrat Passes Federal Requirement Plan for
Transmission Networks
. Berlin: German Energy Blog.
www.germanenergyblog.de/
Lang, M. and U. Mutschler. (2014) Meerbusch Announces to File Constitutional
Complaint Against Law Accelerating Expansion of Electricity Grids. Berlin: German
Energy Blog.
www.germanenergyblog.de/?p=13830#more-13830
Lasher, W. P. (2008) The Development of Competitive Renewable Energy Zones in Texas.
Paper presented at the
Transmission and Distribution Conference and Exposition, 2008
.
Chicago,
IL,
April
21-24,
2008.
Meegahapola, L. and D. Flynn. (2010) Impact on Transient and Frequency Stability for
a Power System at Very High Wind Penetration. Paper presented at the
Power and
Energy Society General Meeting, 2010 IEEE
, July 25-29, 2010, Minneapolis, MN.
ieeexplore.ieee.org/xpl/
articleDetails.jsp?tp=&arnumber=5589908&queryText%3DImpact+on+Transient+and+Frequency+Stability+for+a+Power+System+at+Very+High+Wind+Penetration
MISO. (2010)
Regional Generation Outlet Study
. MISO, Carmel, Indiana.
MISO. (2011) Compliance Filing of the Midwest Independent Transmission System
Operator, Inc. regarding Dispatchable Intermittent Resources Docket No.
ER11-1991-00. FERC: FERC.
MISO. (2014) MISO Transmission Expansion Planning (MTEP). MISO, Carmel, Indiana.
Musgrove, P. (2010)
Wind Power
. Cambridge, UK: Cambridge University Press.
Search WWH ::
Custom Search