Civil Engineering Reference
In-Depth Information
Fig. 7.2
Lifting large and long purlins.
building sites, should be carried out well before delivery, and on the very largest sites a
permanent truss storage system built as part of the site set-up (see Fig. 7.3).
 
Search WWH ::




Custom Search