Biomedical Engineering Reference
In-Depth Information
1
Exponential
Gamma
Inverse Gaussian
0.5
0
0
0.5
1
Model Quantiles
Figure 9.4
Kolmogorov-Smirnov plots for the fits of the exponential (dotted line), gamma (solid
line), and inverse Gaussian (solid bold line) models to the neural spike train in Figure
9.2. The parallel diagonal lines are the 95% confidence bounds for the degree of
agreement between the models and the spike train data. By this criterion, statistically
acceptable agreement between a model and the data would be seen if the KS plot for
that model fell entirely within the confidence bounds.
Exponential
Gamma
Inverse Gaussian
ˆ l
ˆ l
ˆ l
ˆa
ˆm
q
0.0325
0.805
0.262
30.76
12.1
CI
[0.0283 0.0367]
[0.678 0.931] [0.208 0.316]
[24.46 37.06] [9.9 14.3]
ISI
30.77
±
30.77
30.73
±
34.74
30.76
±
49.0
AIC
8598
8567
8174
KS
0.233
0.2171
0.1063
Ta b l e 1 : The row is the maximum likelihood estimate q. CI (95% confidence inter-
val for the parameter); ISI (interspike interval mean and SD); AIC (Akaike's Infor-
mation Criterion); KS (Kolmogorov-Smirnov statistic).
 
Search WWH ::




Custom Search