Environmental Engineering Reference
In-Depth Information
N
in
;
N
res
a
/
S
, 100%
9.31
Number of defects in HETs of the 2PG-1 steam generator:
1) prior to SPM-96; 2) after plugging during SPM-96, 97; 3) after
plugging during SPM-98.
(
a
/
s
)·100%
Operating time, years
a)
2
c
, mm
b)
9.32
Kinetics of propagation of surface cracks in relation to the
initial size at a safety factor of 10 (a) and dependence of through-
wall crack growth on the number of cycles
N
(b).
Search WWH ::
Custom Search