Environmental Engineering Reference
In-Depth Information
N in ; N res
a / S , 100%
9.31 Number of defects in HETs of the 2PG-1 steam generator:
1) prior to SPM-96; 2) after plugging during SPM-96, 97; 3) after
plugging during SPM-98.
( a / s )·100%
Operating time, years
a)
￿ ￿ ￿ ￿ ￿
2 c , mm
b)
9.32 Kinetics of propagation of surface cracks in relation to the
initial size at a safety factor of 10 (a) and dependence of through-
wall crack growth on the number of cycles N (b).
 
Search WWH ::




Custom Search