Depth of defect, % to wall thickness
9.30 Results of evaluation of the detectability of ECT (eddy current
testing) and pneumo-hydraulic inspection (PHI) of PGV-1000 heat
exchanger tubes using the SPM-96 results: 1 - ECT in SPM-96;
2 - PHI; 3 - HT+PHI; 4 - ECT in SPM-98 (specified on the basis of
data from SPM-98).
Table 9.11 Comparison of the sizes of defects identified during ECT and MI
of HET of steam generator No. 2 at the Balakovo NPP
Number of HET
(according to AER)
Depth of defect a , %
of pipe thickness s
Inaccuracy
Steam
generator
No.
Location of
defect
( a ECT - a MI ), % of s
Row
Column
ECT
MI
- 60
2
NR3; 000
94
53
+41
92
60
NR3; 000
80
≈ 1
+79
92
60
NR6; 000
-
100
- 100
1
￿ ￿ ￿ ￿ ￿
1
61
NR2; 000
-
100
- 100
Between HP4-
HP5
-
- 88
1
61
88
NR3; - 320
102
60
80
2
78
102
60
NR3; 000
-
100
- 100
3
- 60
NR3; - 290
96
100
100
0
- 60
-
- 100
96
NR3; 000
100
Comment:
1. (+) and (-) in the last column indicate over-rejection and under-rejection,
respectively according to the result of eddy current testing (ECT).
2. NR3 (6;2) is the spacing lattice No. 3 (6;2); 320 (290) is the distance from the
lattice to the defect, to collector (-) and from collector (+)
3. AER is the organisation contracted to carry out ECI