The recorded and modeled maximum discharge (m 3 /s) in the Ubaye River
Table 6.9
Number
Years
Maximum hourly discharge
Number
Years
Maximum hourly discharge
1957 a
1
480
17
1995
80.47
2
1980
80
18
1996
54.47
3
1981
87.35
19
1997
89.25
4
1982
61.5
20
1998
83.17
5
1983
101.24
21
1999
92.33
6
1984
88.03
22
2000
129.34
7
1985
76.77
23
2001
119.38
8
1986
86.5
24
2002
84.67
9
1987
59.39
25
2003
70.83
10
1988
30.34
26
2004
42.08
11
1989
42.41
27
2005
89.06
12
1990
34.75
28
2006
50.41
13
1991
81.51
29
2007
18.72
2008 a
14
1992
65.18
30
205
15
1993
86.37
31
2009
89.07
16
1994
182.92
a
The recorded maximum discharge (m 3
/s)
6.7 Roughness Values
The roughness coefficients varied between 0.02 and 0.07 m -1 /3 s-1 according to
characteristics of natural channel. The friction coefficients were adjusted in order
to achieve the best fit between the simulated and observed water stages. These
roughness values are based on land use maps which were digitized according to
related aerial photos (Fig. 6.16 ).
Based on the available aerial photo, six roughness maps were prepared to use as
an important input data in flood modeling. The results of the coefficient values are
presented in Fig. 6.17 . Distribution of roughness coefficients in a channel section
is an important aspect that needs to be addressed properly. A roughness value
underestimates the discharge and a low value can overestimate.
The selection of a suitable value of n is the single most important parameter for
the proper estimation of velocity in an open channel.
For being sure about the correct selected roughness value for the channel, the
model was run for different values of 0.02-0.07. The result of hydraulic depth was
compared with observed data at Abattoir Bridge. Manning's value of 0.02 was