Environmental Engineering Reference
In-Depth Information
Table 13.3
(continued)
Area for
measures
(ha)
Percentage
of case
study area
Implementation
costs
(10 years)
Benefits for sectoral objectives
Multifunct.
measures a
E (extention
of measures
on erosive sites),
objective
fulfillment
(%)
W (N-reduction
in kg/ha*a),
objective
fulfillment
(%)
C (reduction of
CO 2 -emissions
in t/ha),
objective
fulfillment
(%)
B (upgrading
of Habitat
value points),
objective
fulfillment
(%)
M16
1,829
2.6
49,827,464
401
51,358
1,981,670
4,168
M17
221
0.3
15,052,503
212
11,065
14,815
664
M18
284
0.4
459,618
0
0
0
567
M13/M12
27
0.0
221,003
27
746
942
67
M14/M12
609
0.9
7,896,557
326
98,237
16,172
1,522
M16/M13
60
0.1
902,677
30
2,573
51,089
178
M16/M13/M14
108
0.2
1,538,305
21
3,874
149,146
241
M16/M14
305
0.4
6,194,196
3
0
0
485
a
unintentional spatial overlap of similar or synergizing measures (sum (ha))