The first floor panels are put into position, incorporating IJ floor beams (see inter-
nal images).
The wall panels are erected by two joiners and one labourer within a one day period.
Internal frame and floor panels
On site panel fabrication area- scaffold framed temporary building with open front
General internal view of ground floor area