The sequence of work for the main factory unit commences with the construction of
a high bay portal adjacent to the gable of the water treatment building. This is fol-
lowed by the erection of the four bay 40 m span portals forming the remainder of the
main factory unit. On completion of the main factory unit, the construction of the
two bay portal framed rear main building commenced.
9.10 Erection sequence for the main steel frame
High bay portal
Commencement of the erection of the nine bay high level portal frame