Elevation of the completed building
8.1 Contents of the case study
This inner city development of £12 million involves the construction of a five storey
steel-framed office block alongside a six to ten storey precast crosswall hotel block.
The case study covers the following aspects of the project.
●
A description of the works for the office block and hotel building.
●
Client/contractor relationships, together with the main contractor's site
organisation structure.
●
Value engineering proposals of the “preferred bid” contractor for this single-stage
design and build project are outlined.
●
The factors influencing crane selection are outlined as site space restrictions
limited their choice and movement.
●
Site layout planning, plus the approach to management of materials on site construc-
tion sequence for the erection of precast concrete crosswall frame for the hotel block.
●
The programme for the office block sequence of work.
●
Progress monitoring of the brickwork to the external elevations.
●
The method of constructing the external brickwork outer wall, in relation to the
value engineering proposals.
●
The sequence of construction for the six-storey steel-framed office block.
Students and readers are then required to prepare a programme for the frame.
Comments are also included on the value engineering proposals with respect to
the external brickwork.