Elevation of the completed building
8.1 Contents of the case study
This inner city development of £12 million involves the construction of a five storey
steel-framed office block alongside a six to ten storey precast crosswall hotel block.
The case study covers the following aspects of the project.
A description of the works for the office block and hotel building.
Client/contractor relationships, together with the main contractor's site
organisation structure.
Value engineering proposals of the “preferred bid” contractor for this single-stage
design and build project are outlined.
The factors influencing crane selection are outlined as site space restrictions
limited their choice and movement.
Site layout planning, plus the approach to management of materials on site construc-
tion sequence for the erection of precast concrete crosswall frame for the hotel block.
The programme for the office block sequence of work.
Progress monitoring of the brickwork to the external elevations.
The method of constructing the external brickwork outer wall, in relation to the
value engineering proposals.
The sequence of construction for the six-storey steel-framed office block.
Students and readers are then required to prepare a programme for the frame.
Comments are also included on the value engineering proposals with respect to
the external brickwork.