of the strategy for different changes in the filling level set-point. Between 100 and
160 minutes, the set-point is smaller than the constraint and the controller is able
to take the process at its value. However, at 160 minutes the set-point is larger than
the constraint and the controller stabilizes the processes at the constraint. At 230
minutes, the constraint on the filling level is lifted and the controller is able to take
the process to the reference point. The density is controlled at its set-point and is
only perturbed when the controller activates the constraints, as seen in Figure 5.20.
Finally, all supervised variables (pebble flowrate and sump level) are maintained in
their normal operational ranges, as seen in Figure 5.19.
40
30
20
150
200
250
300
350
400
450
500
1400
1200
1000
150
200
250
300
350
400
450
500
10.5
10
9.5
9
8.5
150
200
250
300
350
400
450
500
Samples (k)
Figure 5.18 Stabilizing controller: filling level, fresh flowrate, mill speed
400
300
200
150
200
250
300
350
400
450
500
80
60
40
20
150
200
250
300
350
400
450
500
800
700
600
500
150
200
250
300
350
400
450
500
Samples (k)
Figure 5.19 Stabilizing controller: pebbles flowrate, sump level, pulp flowrate
Search WWH ::




Custom Search