Information Technology Reference
In-Depth Information
Table 3.25. Final population with fitness
Fitness
Population
31
1
3
5
2
4
31
5
4
3
2
1
33
4
5
3
1
2
31
2
1
4
3
5
31
3
5
4
2
1
31
2
1
4
3
5
32
4
3
5
1
2
30
2
1
3
5
4
32
2
5
1
4
3
31
5
3
1
2
4
The new solution has a fitness of 30, which is a new fitness from the previous gen-
eration. This population is then taken into the next generation. Since we specified the
G max = 1, only 1 iteration of the routine will take place.
Using the above outlined process, it is possible to formulate the basis for most per-
mutative problems.
3.6
Flow Shop Scheduling
One of the common manufacturing tasks is scheduling . Often in most manufacturing
systems, a number of tasks have to be completed on every job . Usually all these jobs
have to follow the same route through the different machines , which are set up in a
series. Such an environment is called a flow shop (FSS) [30].
The standard three-field notation [20] used is that for representing a scheduling prob-
lem as
describes the de-
viations from standard scheduling assumptions, and F ( C ) describes the objective C
being optimised. This research solves the generic flow shop problem represented as
n / m / F
α | β |
F ( C ),where
α
describes the machine environment,
β
F ( C max ).
Stating these problem descriptions more elaborately, the minimization of completion
time (makespan) for a flow shop schedule is equivalent to minimizing the objective
function
||
:
n
j =1 C m , j
=
(3.8)
s.t.
C i , j = max C i 1 , j , C i , j 1 + P i , j
(3.9)
j
k =1 C 1 , k ;
where, C m , j = the completion time of job j , C i , j = k (any given value), C i , j =
j
k =1 C k , 1 machine number, j jobinsequence, P i , j processing time of job j on
C i , j =