Information Technology Reference
In-Depth Information
Fig. 7.38. 1000 PC cluster 2
[18] gave a brief outline for the different operating parameters as given in
Tab le 7 . 2 0.
These general outlines were formulated after experimentation [18], however they
were not intended for permutative problems. Since this is realized as a novel approach
for DE, it becomes than imperative to create a experiment procedure for the formulation
of these control values. Alongside these control values, these are altogether 7 general
operating DE strategies.
1. Rand 1 Bin
2. Rand 2 Bin
3. Best 2 Bin
4. Local to Best
5. Best 1 JIter
6. Rand 1 DIter
7. Rand 1 GenDIter
Search WWH ::




Custom Search