Civil Engineering Reference
In-Depth Information
(b) The additional reinforcing needed over the columns is to be designed for a moment
f M u .
1
1
f
0.60
(ACI Equation 13-1)
b 1
b 2
2
2
15 6.75
15 6.75
1
3
1
3
f M u (0.60)(57.6) 34.6 ft- k
(c) Add two #6 bars in the 39 width and check to see whether the moment transfer situation is
satisfactory. To resist the 34.6 ft-k, we now have the two #6 bars just added plus three #6 bars put in
for the column strip design, or five #6 bars (2.21 in. 2 ).
A s f y
0.85 f
(2.21)(60)
(0.85)(3)(39)
a
c b
1.333
d a
2
M n M u A s f y
6.75 1.333
2
(0.9)(2.21)(60)
12
60.5 ft- k 34.6 ft- k
OK
6. Compute combined shear stress at exterior column due to shear and moment transfer:
(a)
Nominal moment strength of full column strip with eight #6 bars (3.53 in. 2 ).
(3.53)(60)
(0.85)(3)(54) 1.538
a
6.75 1.538
2
(3.53)(60)
M n
105.56 ft- k
12
(b) Fraction of unbalanced moment carried by eccentricity of shear v M n .
1
v 1
0.40
1 2
15 6.75
15
3
6.75
v M n (0.40)(105.60) 42.22 ft- k
(c)
Compute properties of critical section for shear (Figure 16.23).
A c (2 a b ) d (2 18.375 21.75)(6.75) 394.875 in. 2
18.375
2
(2)(18.375)(6.75)
c AB
5.77 in.
394.875
2 a 3
3
ad 3
6
(2 a b )( c AB ) 2
J c d
(2)(18.375) 3
3
(2 18.375 21.75)(5.77) 2
6.75
(18.375)(6.75) 3
6
15,714 in. 4