Environmental Engineering Reference
In-Depth Information
Table 14.4.
Minimum required frequency of construction testing - Zone 1 earthfill.
Dam
Country
Fill volume
Particle size
Atterberg limits
Water content
Density ratio
Permeability
Shear strength
8,649,00 yd 3
4,000 yd 3
4,000 yd 3
4,000 yd 3
4,000 yd 3
150,000 yd 3
Oroville
USA
-
27,000 yd 3
1,800 yd 3
500 yd 3
1,000 yd 3
6,750 yd 3
13,500 yd 3
Culmback
USA
-
11,500,000 m 3
56,000 m 3
56,000 m 3
1,150 m 3
1,150 m 3
56,000 m 3
Beas
India
1,900,000 m 3
4,000 m 3
1,000 m 3
4,000 m 3
800,000 m 3
QA-8, La Grande
Canada
If required.
2 tests/season
1,270,000 yd 3 (1)
4,000 yd 3
4,000 yd 3
4,000 yd 3
Brandy Ranch
USA
-
-
-
1,750,000 yd 3
5,000 yd 3
5,000 yd 3
5,000 yd 3
5,000 yd 3
Bloomington
USA
15 tests
- (2)
15,000 m 3 or
15,000 m 3 or
5,000 m 3 or
5,000 m 3 or
Winneke
Australia
-
-
2 per week
2 per week
1 per day
1 per day
135,000 m 3
3,000 m 3
3,000 m 3
500 to 1000 m 3
Ranger Mine
Australia
1 per shift
Some
Some
Tailings Dam (3)
(1) Earthfill and random fill.
(2) Random fill.
(3) Embankment is zoned earth and rockfill.
Notes:
Copyright © 2005 Taylor & Francis Group plc, London, UK
 
 
Search WWH ::




Custom Search