Civil Engineering Reference
In-Depth Information
40
UCL
38
35
Target 30.5
30
25
LCL
23
20
0
5
10
15
20
25
30
35
40
Sample number
(a)
25
UCL
24
20
15
Target 11
10
5
0
LCL 0
0
5
10
15
20
25
30
35
40
Sample number
(b)
FIGURE 1.21 Statistical control charts: (a) X-bar chart and
(b) R chart. UCL indicates upper control limit; LCL indicates lower
control limit.
(a)
(b)
(c)
(d)
(e)
(f)
FIGURE 1.22 Possible trends of means and ranges in statistical control
charts: (a) sudden change in mean, (b) gradual change in mean, (c) irregular
change in mean, (d) sudden change in range, (e) gradual change in range, and
irregular change in mean and range.
Search WWH ::




Custom Search