Civil Engineering Reference
In-Depth Information
Fig. 2.9
Roving procedure.
Black
: references (2
3D, 1
1D).
Red
: Track of the rovers on main girder and pylon from Setup 1 to Setup 5
(3
3D).
Green
: The eight DOF's on cables 240/230, two on each cable, located at 2 m above bridge deck and at 0.4 L respectively, were moved
to cables 140/130, 120/110 and 210/220 (see Fig.
2.7
) for the setups 2-4. Setup 5 was performed without measurement points on the cables
Fig. 2.10
Sensors at the pylon tip (
left
) and at a cable (
right
)
Fig. 2.11
Twenty four cable rolls (
left
), the measurement van (
middle
) and the frontend and laptop (
right
)