Civil Engineering Reference
In-Depth Information
Fig. 2.9 Roving procedure. Black : references (2 3D, 1 1D). Red : Track of the rovers on main girder and pylon from Setup 1 to Setup 5
(3 3D). Green : The eight DOF's on cables 240/230, two on each cable, located at 2 m above bridge deck and at 0.4 L respectively, were moved
to cables 140/130, 120/110 and 210/220 (see Fig. 2.7 ) for the setups 2-4. Setup 5 was performed without measurement points on the cables
Fig. 2.10 Sensors at the pylon tip ( left ) and at a cable ( right )
Fig. 2.11 Twenty four cable rolls ( left ), the measurement van ( middle ) and the frontend and laptop ( right )
Search WWH ::




Custom Search