Civil Engineering Reference
In-Depth Information
that allows for the non-uniform tension in the concrete prior to cracking.
In Equation 4.32,
h
c
is the thickness of the concrete flange, excluding any
ribs, and
z
0
is the distance of the centroid of the uncracked composite
section (for short-term loading) below the centroid of the concrete flange.
For composite beams, the ratio
z
0
/
h
c
typically increases with the span.
Where it exceeds 1.17,
k
c
1.0, and the tension is effectively treated as
uniform over the thickness of the concrete flange.
Finally,
f
sk
in Equation 4.31 is replaced by
=
σ
s
, the maximum stress
permitted in the reinforcement immediately after cracking (
≤
f
sk
), which
influences the crack width. This leads to the design rule
A
s
≥
0.8
k
c
f
ct,eff
A
ct
/
σ
s
(4.33)
To use this rule, it is necessary to estimate the value of the tensile
strength
f
ct,eff
when the concrete first cracks. If the intrinsic deformation
due to the heat of hydration or the shrinkage of the concrete is large,
cracking could occur within a week of casting, when
f
ct,eff
is still low.
Where this is uncertain, EN 1994-1-1 permits the use of the mean value
of the tensile strength corresponding to the specified 28-day strength of
the concrete,
f
ctm
, which is approximately 0.1
f
ck
, or 0.08
f
cu
, where
f
cu
is the
specified cube strength.
The choice of the stress
σ
s
depends on the design crack width,
w
k
, the
diameter
φ
of the reinforcing bars, and the value of
f
ct,eff
. Figure 4.7 gives
Figure 4.7
Maximum steel stress for minimum reinforcement, high
bond bars