Environmental Engineering Reference
In-Depth Information
WORKSHEET 8 . STRUCTURAL BMP VOLUME CREDITS
PROJECT:
SUB-BASIN:
Required Control Volume (ft
3
) -
from Worksheet 7 :
Non-structural Volume Credit (ft
3
) -
from Worksheet 3:
-
Structural Volume Reqmt (ft
3
)
(
Required Control Volume minus Non-structural Credit
)
Area
(ft
2
)
Storage
Volume (ft
3
)
Proposed BMP*
6.4.1
Porous Pavement
.
6.4.2
Infiltration Basin
6.4.3
Infiltration Bed
6.4.4
Infiltration Trench
6.4.5
Rain Garden/Bioretention
6.4.6
Dry Well / Seepage Pit
6.4.7
Constructed Filter
6.4.8
Vegetated Swale
6.4.9
Vegetated Filter Strip
6.4.10
Berm
6.5.1
Vegetated Roof
6.5.2
Capture and Re-use
6.6.1
Constructed Wetlands
6.6.2
Wet Pond / Retention Basin
6.6.3
Dry Extended Detention Basin
6.6.4
Water Quality Filters
6.7.1
Riparian Buffer Restoration
6.7.2
Landscape Restoration / Reforestation
6.7.3
Soil Amendment
6.8.1
Level Spreader
6.8.2
Special Storage Areas
Other
Total Structural Volume (ft
3
):
Structural Volume Requirement (ft
3
):
DIFFERENCE
Search WWH ::
Custom Search