Table 4-2 ( Continued )
• Is applicant submission complete or fully responsive to municipal zoning or
SLDO requirements?
• Is useful interaction (meeting, site visit, etc.) occurring at the sketch plan or
even presketch plan phases?
All Other Inputs: County, State, Federal
Step 3 . Presubmission Meeting and Site Visit
Step 4 . Inventory for Opportunities and Constraints
Watershed Factors Inventory
• Major/minor watershed/location?
• State stream use/standards designation/classification?
• Special high-quality designations?
• Required standards?
• Any Chapter 303d/impaired stream listing classifications?
• TMDLs?
• Existing, planned?
• Existing/planned downstream sensitivities?
• Water supply intakes?
• Known downstream flooding?
• Known water quality trends in the major or minor watershed?
• Aquatic biota, other sampling, monitoring?
Site Factors Inventory
• Important natural site features?
• Existing hydrology (drainage, swales, intermittent)?
• Existing topography, contours?
• Existing subbasins?
• Soils, their hydrologic groups?
• Seasonal high water table, depth to bedrock, hydric?
• Alluvium?
• Geologic issues?
• Carbonate?
• Slide potential?
• Earthquake zone?
• Existing vegetation?
• Woodlands, forests?
• Specimen trees, mature, other?
• Shrub layer, meadows?
• Species of special importance?
• Limited habitat?