by a suspension bridge with a length of 1,400 metres and a main span of
810 metres.
Further delay
However, implementation of the plan just never came about: politics appeared
to be a factor which was (too) uncertain.The period 1972 up to the end of the
1980s were marked by 'highs and lows'. Sometimes very little seemed
to obstruct the realisation of the river crossing, and then again sometimes
 
 