Civil Engineering Reference
In-Depth Information
Fig. 12.8
Dumping soil onto
working site adjacent
to separation plant
Fig. 12.9
Dumping soil onto
working site adjacent
to separation plant
contact was made with a 'marketer' in the soil trade whose most important
task was to set up an organisation to deal with the sale of the cuttings. The
NV Westerscheldetunnel's intention was to achieve targeted sales of soils
that become available, such as clay, sand and a mixture of both soil types.
In the period from June through August 1999 an attempt was made to find
private partners with commercial experience in the selling of sand and clay.
However, there appeared to be very little 'private' interest. Eventually an
agreement was concluded between the NV Westerscheldetunnel and the
Combinatie Hergebruik Boorspecie [Combination Reuse boring spoil] (CHB)
consisting of two of the contractors involved in the project and permanent
players in the raw-materials sector.
 
 