Fig. 10.3
The installation of the
TBMs took 3 months
Diagrammatic
drawing of a TBM
Fig. 10.4
11550
Cutting
wheel
Lining
Shield
2
1
2
3
4
Submerged wall
Tail seal
Hydraulic jacks
Removal of bentonite
slurry
3
Segment
6
8
Erector
7
5
Supply of bentonite
suspension
Air lock
Pressure wall
Air cushion
5
4
1
6
7
8
3
2
Trailer
 
 