Table 7.10 Model treatment plan for silvipastoral plantation (SPP-200)
Sr. No.
Item/activity
Specifications of item
Quantity
Year of execution
1
Survey and demarcation
Surveying the area with chain and compass, demarcating it with
monoliths or masonry pillars, and preparation of map of the
area 1:5,000 scale, topo-map and treatment maps
50 ha
Y1
2
Fencing
Fencing the area with ditch-cum-bund fence of section DB-2,
with suitable provision for drainage of water at required
number of places
3,000 m
Y1
3
Nursery work
Raising of plants in temporary nursery on site, including 20 %
extra plants for casualty in handling, transport, etc.
12,000 nos.
Y1, Y2
4
Soil and water conservation works
4.1 Digging of V-ditch of section VD-1, at a spacing suitable for
terrain, say from 30 m to 75 m depending upon slope, in soils
of hardness class:
(a) S3
5,000 m
Y1
(b) S4
5,000 m
Y1
4.2 Making of contour furrows in between V-ditches with the
help of tractor-drawn disc plough, at 1.5 m interval
300,000 m
Y2
4.3 Excavation of pits of standard size P-3 in the space between
the contour lines, in soils of hardness class:
(a) S3
5,000 nos.
Y2
(b) S4
5,000 nos.
Y2
250 m 3
4.4 Construction of loose-stone check dams (LSCDs) across
streams, etc.
Y2
4.5 Construction of saucers of 1 m diameter around the planted
seedlings in order to harvest and retain water, in soils of
hardness class:
(a) S1, S2, or S3
5,000 nos.
Y2
(b) S4
5,000 nos.
Y2
5
Sowing of seeds for CVH, on keylines
5.1 Sowing of seeds of tree and shrub species in two parallel
rows at 20 cm spacing on the bunds of contour V-ditch, and in
three rows on the bund of the fence, by hand dibbling, just
before rains
29,000 row-m