Table 7.7 Comparative costs for RDF works with different densities of planting
Treatment model
Total cost (mdeq)
Cost on different operations (%)
Fencing
Others a
S&WC works
Plant raising
Pits and planting
Maint. ops.
Watch and ward
Total
RDF-100
11,204
24.63
22.56
2.48
4.79
11.61
12.18
21.73
100.00
RDF-200
12,460
22.15
20.29
4.46
8.62
13.18
10.96
20.35
100.00
RDF-300
13,766
20.05
18.36
6.04
11.70
14.41
9.92
19.52
100.00
RDF-400
15,080
18.30
16.76
7.37
14.24
15.42
9.05
18.85
100.00
RDF-500
16,445
16.78
15.37
8.44
16.31
16.21
8.30
18.58
100.00
Intensity of soil work other than pits is presumed same as in RDF-400
RDF rehabilitation of degraded forest, mdeq man-day equivalent, S and WC soil and water conservation, Maint. ops. maintenance operations
a Includes pesticides, labour amenities, sowing of shrub seeds, repair of fence, maintenance of workers' tools, gate on the fence, signboard, inspection path,
survey and alignment, and contingent expenditure
 