Table 7.5 (continued)
Item No.
Item specifications
Unit
Quantity
Required man-days
Material (mdeq)
US
SS
SK
Subtotal of survey and marking
285
66
16
61
Part-2: Work execution
1-10
Raising of plants, in temporary nursery at site, of the following species having height
not less than 50 cm and age 4-5 months, including 20 % extra to account for
casualties in transit and for beating up:
(a) Butea monosperma
nos.
6,000
96
7
73
(b) Zyzyphus mauritiana
nos.
6,000
96
7
73
(c) Acacia nilotica
nos.
2,400
38
3
29
(d) Cordia gharaf
nos.
6,000
96
7
73
(e) Holoptelia integrifolia
nos.
3,600
58
4
44
1-11
Laying of dry-stone masonry in wall for fence with compact and interlocked structure
and high stability, volume of voids not exceeding 20 % of total volume, having
suitable provision for drainage where required, using stones of irregular shape as
available at site, where stones have to be collected and fetched from an average
distance of 100 m, and the wall is of standard section SW-1
m
3,000
2,520
1-12
Topping fence wall with locally available clay or clay-gravel mixture, including
excavation of material and spreading a layer of 7.5 cm average thickness, so as to
stabilise top layer of stones against falling, where wall is of standard section SW-1
m
3,000
120
1-13
Excavation of trench of 30
30 cm section, running parallel to wall at 0.50 m
distance, including forming the excavated soil into a continuous bund along edge
of trench, where soil is of hardness class:
(a) S1, S2, or S3
×
m
500
20
(b) S4, S5, or S6
m
2,500
100
1-14
Excavation of contour trench on alignment already marked in field, including
forming of excavated soil into a bund all along the edge of the trench, the trench
being of standard section CT-1, where soil is of hardness class:
(a) S3
m
7,500
338
(b) S4
m
15,000
900
 