Table 7.1 (continued)
Sr. No.
Item specifications
Unit of work
Required man-days
Unskilled
Semi-skilled
Skilled
(ii) SW-2
100 m
112
(iii) SW-3
100 m
75
3
(c) Stones have to be collected and fetched from an average distance of more than 100 m but
less than 250 m, and the wall is of standard section:
(i) SW-1
100 m
93
(ii) SW-2
100 m
125
(iii) SW-3
100 m
83
3
(d) More than 50 % stones have to be split or cleaved from ground with a crowbar or
pickaxe, and wall is of standard section:
(i) SW-1
100 m
112
(ii) SW-2
100 m
150
(iii) SW-3
100 m
98
3
(e) More than 50 % stones have to be quarried, using wedges, jumpers, etc., and the wall is
of standard section:
(i) SW-1
100 m
168
(ii) SW-2
100 m
225
(iii) SW-3
100 m
145
3
3-2
Topping fence wall with locally available clay or clay-gravel mixture, including excavation of
material and spreading a layer of 7.5 cm average thickness, so as to stabilise top layer of
stones against falling, where wall is of standard section:
(a) SW-1
100 m
4
(b) SW-2
100 m
5
3-3
Excavation of trench of 30
30 cm section, running parallel to wall at 0.50 m distance,
including forming the excavated soil into a continuous bund along edge of trench, where
soil is of hardness class:
(a) S1, S2, or S3
×
100 m
4
(b) S4, S5, or S6
100 m
9
3-4
Repair of dry stonewall, including pulling it down completely and rebuilding, including
collecting supplementing stones if required:
 