Agriculture Reference
In-Depth Information
Minimum Free-board
Normal Free-board
Crest Level
Original Ground Profile
Stripping
Line
Bed-rock
Profile of Stream-bed
Streambank Contours
3 m Wide Top
Width of Embankment
at Ground Varies
as Does Height
Plan View
t
f
2.5:1
Riprap on Upstream Slope
Laid on Mines Waste
2:1
h
Key
Trench
d
1:1
a
b
c
p
q
p
Section of Embankment
Values of Parameters Shown: An Example
a = 9.50 m
b = 8.00 m
c = 4.00 m
d = 2.00 m
p = 1.25 m
q = 1.50 m
h = 5.00 m
f = 1.00 m
t = 3.00 m
Rip-rap thickness = 0.30 m
Crest: mines-waste = 0.10 m
camber = 0.15 m
Guide to Quick Estimation of Cost of Embankment
Height (m):
Cost/m (mdeq):
1.00
1.50
2.00
2.50
3.00
3.00
6.00
10.00
16.00
25.00
Fig. 5.8 Earthen embankment
ground with two parallel lines and a centre line. Surface excavation is carried out
for foundation-stripping to a suitable depth, so that all organic matter and loose
permeable soil is removed. A key trench—meant to cut off subsoil flow of water—is
excavated as provided for in the design. Construction of the embankment is then
 